SteamGard, Engineering Resources Inc
  • Home
  • Our Technology
    • How It Works
    • Product Categories
    • The STEAMGARD® Process
    • Project Goals
  • Where it's working
    • Commercial Laundries
    • Corrugated Manufacturing
    • Food and Seed Processing
    • Hotels
    • Institutions
    • Paper Manufacturing
    • Petrochemical Processing
    • Pharmaceutical Manufacturing
    • Power Generation
    • Textile Production
  • Steam Problem?
  • FAQs
  • News
    • Archive
  • Customer Service
  • Contact Us
    • Complimentary Teach 'n' Treat
    • Tell us about STEAMGARD
    • Ask a STEAMGARD Engineer
    • Employment Opportunites

STEAMGARD® helps
reduce your energy
consumption 8-20%
now – with immediate
gains in productivity


STEAMGARD®: With no
moving parts, you're
assured of long-term
performance – plus
guaranteed reliability


STEAMGARD's® 5-year
product warranty
saves money – there's
no need to inventory
spare parts, repair kits





www.steamgard.com
STEAMGARD, LLC
730 Forest Edge Drive
Vernon Hills, IL 60061
847-913-8400
800-258-6771

Project Goals

Project goals can be established by identifying many of the chronic problems that occur in virtually all steam system applications. The solution to such problems are intended to result in lower energy usage, reduced operating expenses, reduced steam consumption, reduced maintenance costs and increased process/equipment efficiency.

An essential part of this first step is gathering valid historical data that can include information about:

  • Existing operating conditions
  • Fuel consumption, production and weather profiles
  • Boiler system operating procedures
  • Current maintenance practices, schedules and costs
  • Comparing design and actual throughput limits at unit and plant level
  • Steam processing problems perceived at operator and management levels

System Engineering Evaluation and Analysis

An expert and experienced STEAMGARD engineering team, using tools that can range from infrared thermal spectrography to an ultrasound recorder to a high temperature pyrometer, conducts a thorough inspection of the your complete steam system. We start in the boiler room and follow all steam lines in the facility to locate all steam-using equipment to evaluate how all components of the steam system work together.

Control valves, check valves, piping and other elements are evaluated; steam traps in the system are tested and tagged.

Location: Tag #4, Pressure Reducing Room

psig: 125
Trap Type: Bucket
Application: Drip


Point 1 Point 2
Temp °F: 326 289
Delta °F: 37
Conclusion: BLOWING

Location: Tag #5, Pressure Reducing Room


psig: 45
Trap Type: Bucket
Application: Drip


Point 1 Point 2
Temp °F: 271 211
Delta °F: 60
Conclusion: OK



Location: Tag #7, Pressure Reducing Room


psig: 45
Trap Type: Bucket
Application: Drip


Point 1 Point 2
Temp °F: 269 246
Delta °F: 23
Conclusion: LEAKING



Location: Tag #32, Basement Crawl Space

psig: 125
Trap Type: Float Thermostatic
Application: Drip


Point 1 Point 2
Temp °F: 199 214
Delta °F: (15)
Conclusion: BACKING UP



After completing a thorough system review, we process the information gathered and prepare an expert analysis, which includes primary Energy Conservation Measures (ECMs). Frequently, we suggest Secondary Energy Conservation Measures (SECM's) for your consideration.

The STEAMGARD evaluation of the system and processes, presented in a comprehensive report, contains a detailed analysis of cost savings and project payback expectations. The report can include suggestions for corrections or modifications to your system that can add value to or upgrade the facility's operations. With its supporting data, photographs, calculations, charts and graphs, our report is presented to you as a working document. We review it with you; the information and your feedback become the blueprint for installation and retrofitting.

A representative payback calculation helps you make an informed decision about the long- and short-term value of your investment.

Factors we identify in calculating the payback include:

  • Excess steam consumption caused by failed mechanical steam traps.
  • Excess energy costs due to excessive steam consumption.
  • Reduced maintenance costs.
  • Increased process/equipment efficiency.

Installation/Retrofit

Our expert installation and retrofit teams of experienced engineers, Field Supervisors and Steam Technicians are trained to ensure efficient and high quality installations with minimum operational interruptions. In addition, our team is flexible, so work can be performed when it is most likely to have little impact on day-to-day operations - nights, weekends or holidays.

An experienced engineer, who serves as Project Manager, and the Crew Supervisor review the site before starting work.

A comprehensive environmental, safety and health program is followed to ensure project safety.

If installation services are conducted by your maintenance personnel or outside contractors, STEAMGARD can provide personnel training and supervision, in addition to helping with commissioning the project.

As the work is being completed, we review our progress regularly to minimize your time for walkthroughs, punch lists and final acceptance.

Measurement and Verification (M&V)

Our engineers are accustomed to utilizing the United States Department of Energy's and industry procedures to measure the performance and verify the value of our projects.

From the Applied Engineering phase, a model of steam consumption and system operating parameters is produced. During M&V, both consumption patterns and operating parameters are reviewed to calculate or estimate the results. We visit the site to review operations and gather data and develop a new consumption model for comparison with the original. For example, if steam is produced for heating only, a linear regression of therms consumed as a function of Heating Degree Days (HDD) can estimate the rate of savings and project actual savings.

Extended Warranty/Inspection

The performance of THE STEAMGARD SYSTEM® is guaranteed for five years and can be extended. Although the system requires minimal maintenance, we are pleased to provide long-term inspection/testing and maintenance services to you, at your request. These services, available throughout North America, feature a response time of 48 hours or less.